IPPC permit for non substantial changes |
133/15012 |
11/08/2023 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/15012 |
Reference of previous authorization's Act: |
D.M. 76 del 03/03/2021 |
Application submission date: |
11/08/2023 |
Ministry Protocol Application submission: |
prot. MASE-2023-132852 |
Ministry Protocol date of application submission: |
11/08/2023 |
Subject: |
iniziativa "alimentazione di materia prima seconda (MPS) da riciclo meccanico all'impianto di produzione di polietilene PE1/2 FASE 2 |
Procedure starting date : |
04/09/2023 |
Launch of public consultation: |
04/09/2023 |
Deadline of submission of Public Comments on IPPC permit: |
04/10/2023 |
Stage of the Procedure: |
on-going procedure |
IPPC permit for non substantial changes |
133/14645 |
21/06/2023 |
IPPC Technical Committee's assessment |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/14645 |
Reference of previous authorization's Act: |
D.M. 76 del 03/03/2021 |
Application submission date: |
20/06/2023 |
Ministry Protocol Application submission: |
prot. MASE/101055 |
Ministry Protocol date of application submission: |
21/06/2023 |
Subject: |
razionalizzazione depositi rifiuti |
Procedure starting date : |
22/06/2023 |
Launch of public consultation: |
22/06/2023 |
Deadline of submission of Public Comments on IPPC permit: |
22/07/2023 |
Stage of the Procedure: |
IPPC Technical Committee's assessment |
IPPC permit for non substantial changes |
133/14354 |
04/04/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/14354 |
Reference of previous authorization's Act: |
D.M. 76 del 03/03/2021 |
Application submission date: |
04/04/2023 |
Ministry Protocol Application submission: |
prot. MASE/53160 |
Ministry Protocol date of application submission: |
04/04/2023 |
Subject: |
"prova impianto mobile per trattamento terziario mediante filtrazione delle acque in uscita dall'impianto biologico di stabilimento" |
Procedure starting date : |
17/04/2023 |
Launch of public consultation: |
17/04/2023 |
Deadline of submission of Public Comments on IPPC permit: |
17/05/2023 |
Decision Number: |
MASE - 2024 - 015116 |
Decision Date: |
26/01/2024 |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
133/13319 |
19/09/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/13319 |
Reference of previous authorization's Act: |
D.M. 76 del 03/03/2021 |
Ministry Protocol Application submission: |
prot. MITE-2022-113553 |
Ministry Protocol date of application submission: |
16/09/2022 |
Subject: |
ottemperanza della prescrizione 41 del PIC dell'AIA rilasciata con Decreto n. 000076 del 03/03/2021 |
Procedure starting date : |
24/05/2023 |
Launch of public consultation: |
24/05/2023 |
Deadline of submission of Public Comments on IPPC permit: |
23/06/2023 |
Decision Number: |
Nota prot. MASE - 2023 - 102704 |
Decision Date: |
23/06/2023 |
Decisions' Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/12034 |
14/09/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/12034 |
Reference of previous authorization's Act: |
D.M. 76 |
Application submission date: |
14/09/2021 |
Ministry Protocol date of application submission: |
14/09/2021 |
Subject: |
Ricezione scarichi idrici chemgas |
Decision Date: |
19/01/2022 |
Notification Reference number: |
MITE-2022-5969 |
Outcome: |
POSITIVO |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/11796 |
29/07/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/11796 |
Reference of previous authorization's Act: |
D.N. 76 del 3/03/2021 |
Application submission date: |
28/07/2021 |
Ministry Protocol Application submission: |
MATTM-2021-83480 |
Ministry Protocol date of application submission: |
29/07/2021 |
Subject: |
Modifica prescrizione 2) par. 13.2 Capacità produttiva del PIC-AIA DM0076 |
Date of notification to the developer of the procedure outcomes: |
21/01/2022 |
Notification Reference number: |
MITE-2022-7354 |
Outcome: |
POSITIVO |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/11240 |
20/01/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/11240 |
Application submission date: |
18/01/2021 |
Ministry Protocol date of application submission: |
20/01/2021 |
Procedure starting date : |
02/02/2021 |
Launch of public consultation: |
02/02/2021 |
Date of notification to the developer of the procedure outcomes: |
18/05/2021 |
Notification Reference number: |
Prot. 52599 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/10831 |
03/07/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/10831 |
Reference of previous authorization's Act: |
DEC514 - 2011 |
Application submission date: |
30/06/2020 |
Ministry Protocol Application submission: |
MATTM51119 |
Ministry Protocol date of application submission: |
03/07/2020 |
Subject: |
Convogliamento al forno combustore B300 della fase gassosa generata durante il carico/scarico dei serbatoi di stoccaggio olio di cracking FOK |
Procedure starting date : |
08/07/2020 |
Decision Number: |
MATTM-2020-84302 |
Decision Date: |
20/10/2020 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
20/10/2020 |
Notification Reference number: |
MATTM-2020-84302 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/10819 |
24/06/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/10819 |
Reference of previous authorization's Act: |
DEC514 - 2011 |
Application submission date: |
24/06/2020 |
Ministry Protocol Application submission: |
MATTM48330 |
Ministry Protocol date of application submission: |
24/06/2020 |
Subject: |
Rilavorazione propilene Basell fuori norma nell'impianto di cracking P1CR |
Procedure starting date : |
03/07/2020 |
Date of notification to the developer of the procedure outcomes: |
02/07/2021 |
Notification Reference number: |
Prot. 71483 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/10689 |
01/04/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/10689 |
Reference of previous authorization's Act: |
DEC 332 del 07/12/2017 |
Application submission date: |
11/03/2020 |
Ministry Protocol Application submission: |
MATTM/22859 |
Ministry Protocol date of application submission: |
01/04/2020 |
Subject: |
Modifica prescrizione 1 |
Procedure starting date : |
05/05/2020 |
Decision Number: |
MATTM-2020-76118 |
Decision Date: |
30/09/2020 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
30/09/2020 |
Notification Reference number: |
MATTM-2020-76118 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/10455 |
22/10/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/10455 |
Reference of previous authorization's Act: |
DVA-DEC-2011-516 |
Application submission date: |
22/10/2019 |
Ministry Protocol Application submission: |
DVA/2019/27801 |
Ministry Protocol date of application submission: |
22/10/2019 |
Subject: |
Ottimizzazione circuito a vapore di diluizione impianto P1CR. |
Procedure starting date : |
31/10/2019 |
Decision Number: |
DM 76 |
Decision Date: |
03/03/2021 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
16/03/2021 |
Notification Reference number: |
MATTM-2021-27618 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
133/10358 |
07/08/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/10358 |
Reference of previous authorization's Act: |
DVA-DEC-514/2011 |
Application submission date: |
07/08/2019 |
Ministry Protocol Application submission: |
DVA/2019/20882 |
Ministry Protocol date of application submission: |
07/08/2019 |
Subject: |
Realizzazione sistema di trattamento degli sfiati derivanti dalle operazioni di azotatura delle navi in progetto presso il pontile Versalis di Brindisi, al punto di ormeggio n. 12 dove vengono attraccate le navi per la movimentazione di benzina da Cracking. |
Procedure starting date : |
06/09/2019 |
Decision Number: |
DM 76 |
Decision Date: |
03/03/2021 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
16/03/2021 |
Notification Reference number: |
MATTM-2021-27618 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
133/9994 |
28/02/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/9994 |
Reference of previous authorization's Act: |
DVA-DEC-514/2011 |
Application submission date: |
28/02/2019 |
Ministry Protocol Application submission: |
DVA/2019/5284 |
Ministry Protocol date of application submission: |
01/03/2019 |
Subject: |
Riesame complessivo dell'AIA |
Procedure starting date : |
06/03/2019 |
Launch of public consultation: |
11/03/2019 |
Deadline of submission of Public Comments on IPPC permit: |
10/04/2019 |
IPPC Committee's opinion date: |
28/05/2020 |
Decision Number: |
DM 76 |
Decision Date: |
03/03/2021 |
Decisions' Outcome: |
Positivo |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
133/9969 |
08/02/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/9969 |
Reference of previous authorization's Act: |
DVA-DEC-2011-514 |
Application submission date: |
08/02/2019 |
Ministry Protocol Application submission: |
DVA/2019/3189 |
Ministry Protocol date of application submission: |
08/02/2019 |
Subject: |
Realizzazione di un sistema di torcia a terra di "tipo chiuso" per impianto di produzione etilene P1CR |
Procedure starting date : |
18/02/2019 |
Launch of public consultation: |
11/03/2019 |
Deadline of submission of Public Comments on IPPC permit: |
10/04/2019 |
Decision Number: |
DM 009 |
Decision Date: |
13/01/2020 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/9880 |
21/12/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/9880 |
Reference of previous authorization's Act: |
DVA-DEC-514 del 16/09/2011 |
Application submission date: |
21/12/2018 |
Ministry Protocol Application submission: |
DVA/2018/29171 |
Ministry Protocol date of application submission: |
21/12/2018 |
Subject: |
Interventi di miglioramento operatività, affidabilità e sicurezza presso Molo Brindisi - Attività tecnicamente connesse AT1 - Carico/Scarico prodotti via mare (Pontile) |
Procedure starting date : |
11/01/2019 |
Decision Number: |
DVA/2019/6936 |
Decision Date: |
19/03/2019 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/9626 |
20/07/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/9626 |
Reference of previous authorization's Act: |
DVA-2011-0000514 del 16 settembre 2011 |
Application submission date: |
20/07/2018 |
Ministry Protocol Application submission: |
DVA/16974 |
Ministry Protocol date of application submission: |
20/07/2018 |
Subject: |
Ricezione scarico temporaneo acque reflue DITTA SIRAI |
Procedure starting date : |
28/08/2018 |
Decision Number: |
DM 223 |
Decision Date: |
05/08/2019 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
26/08/2019 |
Notification Reference number: |
DVA/2019/21777 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1212 |
22/05/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1212 |
Application submission date: |
10/05/2018 |
Ministry Protocol Application submission: |
DVA/10894 |
Ministry Protocol date of application submission: |
10/05/2018 |
Subject: |
Ottemperanza prescrizione 35) par. 9.12 - Piano operativo di dismissione impianti P4A e P4B. |
Procedure starting date : |
22/05/2018 |
Decision Number: |
DM 325 |
Decision Date: |
27/11/2018 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
05/12/2018 |
Notification Reference number: |
DVA/2018/27480 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1147 |
01/06/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1147 |
Application submission date: |
24/05/2017 |
Ministry Protocol Application submission: |
12243/DVA |
Ministry Protocol date of application submission: |
24/05/2017 |
Subject: |
modifica per ricezione scarichi idrici della ditta Cascione Autotrasporti srl |
Procedure starting date : |
01/06/2017 |
Date of request for integrations: |
26/07/2017 |
Decision Number: |
D.M. 332 |
Decision Date: |
07/12/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1141 |
13/04/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1141 |
Application submission date: |
06/04/2017 |
Ministry Protocol Application submission: |
8511/DVA |
Ministry Protocol date of application submission: |
07/04/2017 |
Subject: |
invio, in assetto permanente, dei vapori generati durante le fasi di caricamento delle navi benzina di cracking (BK) al sistema recupero gas di stabilimento |
Procedure starting date : |
13/04/2017 |
Decision Number: |
14604/DVA |
Decision Date: |
21/06/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1139 |
11/04/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1139 |
Application submission date: |
29/03/2017 |
Ministry Protocol Application submission: |
7728/DVA |
Ministry Protocol date of application submission: |
30/03/2017 |
Subject: |
recupero benzina di cracking dal flusso di sode spente provenienti dall'impianto P1CR |
Procedure starting date : |
11/04/2017 |
Decision Number: |
14611/DVA |
Decision Date: |
21/06/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1132 |
16/03/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1132 |
Application submission date: |
02/03/2017 |
Ministry Protocol Application submission: |
4981/DVA |
Ministry Protocol date of application submission: |
02/03/2017 |
Subject: |
Recupero acqua di fondo C807 per lavaggio carica P30B |
Procedure starting date : |
16/03/2017 |
Decision Number: |
9589/DVA |
Decision Date: |
21/04/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1126 |
01/03/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1126 |
Application submission date: |
16/02/2017 |
Ministry Protocol Application submission: |
3714/DVA |
Ministry Protocol date of application submission: |
17/02/2017 |
Subject: |
modifica realizzazione del circuito della QUENCH WATER dell'impianto di produzione etilene P1CR (Fase F1) |
Procedure starting date : |
01/03/2017 |
Decision Number: |
10088/DVA |
Decision Date: |
02/05/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1100 |
03/11/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1100 |
Application submission date: |
24/10/2016 |
Ministry Protocol Application submission: |
25918/DVA |
Ministry Protocol date of application submission: |
24/10/2016 |
Procedure starting date : |
03/11/2016 |
Decision Number: |
6945/DVA |
Decision Date: |
23/03/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/1078 |
14/07/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/1078 |
Application submission date: |
06/07/2016 |
Ministry Protocol Application submission: |
17861/DVA |
Ministry Protocol date of application submission: |
06/07/2016 |
Procedure starting date : |
14/07/2016 |
Decision Number: |
8704/DVA |
Decision Date: |
10/04/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
133/944 |
30/10/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/944 |
Application submission date: |
13/10/2015 |
Ministry Protocol Application submission: |
DVA-2015-0025802 |
Ministry Protocol date of application submission: |
15/10/2015 |
Subject: |
Relazione di Riferimento |
Procedure starting date : |
30/10/2015 |
Decision Number: |
30809/DVA |
Decision Date: |
21/12/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
133/929 |
07/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/929 |
Application submission date: |
31/07/2015 |
Ministry Protocol Application submission: |
DVA-2015-0020969 |
Ministry Protocol date of application submission: |
10/08/2015 |
Subject: |
riesame per modifica prescrizione "posticipo data realizzazione del doppio fondo al serbatoioF268" |
Procedure starting date : |
07/09/2015 |
Decision Number: |
D.M. 316 |
Decision Date: |
30/12/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
133/862 |
12/02/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/862 |
Application submission date: |
27/01/2015 |
Ministry Protocol Application submission: |
DVA-2015-0002369 |
Ministry Protocol date of application submission: |
28/01/2015 |
Subject: |
Sezione stoccaggio acque di prima pioggia |
Procedure starting date : |
12/02/2015 |
Decision Number: |
DVA-2015-0031733 |
Decision Date: |
21/12/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
133/863 |
12/02/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/863 |
Application submission date: |
22/01/2015 |
Ministry Protocol Application submission: |
DVA-2015-002079 |
Ministry Protocol date of application submission: |
23/01/2015 |
Subject: |
Messa in servizio F289 bis |
Procedure starting date : |
12/02/2015 |
Decision Number: |
DVA-2015-32271 |
Decision Date: |
23/12/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/733 |
08/04/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/733 |
Application submission date: |
24/03/2014 |
Ministry Protocol Application submission: |
DVA-2014-0008548 |
Ministry Protocol date of application submission: |
26/03/2014 |
Subject: |
Modifica non sostanziale per fermata per manutenzione emissioni E80/E81 |
Procedure starting date : |
08/04/2014 |
Decision Number: |
DVA-2015-0015739 |
Decision Date: |
15/06/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/735 |
08/04/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/735 |
Application submission date: |
24/03/2014 |
Ministry Protocol Application submission: |
DVA-2014-0008514 |
Ministry Protocol date of application submission: |
26/03/2014 |
Subject: |
Modifica non sostanziale inerente Spedione via nave GPL c4 |
Procedure starting date : |
08/04/2014 |
Decision Number: |
DVA-2015-0027166 |
Decision Date: |
29/10/2015 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/696 |
22/01/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/696 |
Application submission date: |
07/01/2014 |
Ministry Protocol Application submission: |
DVA-2014-0000443 |
Ministry Protocol date of application submission: |
09/01/2014 |
Subject: |
Modifica non sostanziale per razionalizzazione sezione di stoccaggio acque di prima pioggia |
Procedure starting date : |
22/01/2014 |
Decision Number: |
DVA-2014-0017229 |
Decision Date: |
04/06/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/602 |
23/08/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/602 |
Application submission date: |
23/07/2013 |
Ministry Protocol Application submission: |
DVA-2013-0017494 |
Ministry Protocol date of application submission: |
25/07/2013 |
Subject: |
Modifica non sostanziale per a quanto riportato punto 9 del paragrafo 9.4.1 (pag.138), del PIC, allo scopo di contemplare la detrazione dell'intervallo di fiducia dal valore misurato ed elaborato |
Procedure starting date : |
23/08/2013 |
Decision Number: |
DVA-2014-0014556 |
Decision Date: |
16/05/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/568 |
20/06/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/568 |
Application submission date: |
06/06/2013 |
Ministry Protocol Application submission: |
DVA-2013-0013450 |
Ministry Protocol date of application submission: |
10/06/2013 |
Subject: |
Modifica non sostanziale per ricezione via nave del prodotto Raffinato 1 |
Procedure starting date : |
20/06/2013 |
Decision Number: |
DVA-2013-0020578 |
Decision Date: |
10/09/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/569 |
20/06/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/569 |
Application submission date: |
05/06/2013 |
Ministry Protocol Application submission: |
DVA-2013-0013427 |
Ministry Protocol date of application submission: |
10/06/2013 |
Subject: |
Modifica non sostanziale per esclusione dal processo del serbatoio F230 e all'inserimento del serbatoio F242 |
Procedure starting date : |
20/06/2013 |
Decision Number: |
DVA-2013-0019692 |
Decision Date: |
28/08/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/526 |
05/06/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/526 |
Application submission date: |
28/03/2013 |
Ministry Protocol Application submission: |
DVA-2013-0007940 |
Ministry Protocol date of application submission: |
03/04/2013 |
Subject: |
Valutazione art.1, comma 6 Prescrizioni PIC con scadenza a 18 mesi: Mappatura fonti di emissione odorigene |
Procedure starting date : |
05/06/2013 |
Decision Number: |
DVA-2013-0021932 |
Decision Date: |
26/09/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/513 |
21/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/513 |
Application submission date: |
11/03/2013 |
Ministry Protocol Application submission: |
DVA-2013-0006464 |
Ministry Protocol date of application submission: |
14/03/2013 |
Subject: |
Modifica non sostanziale al Revamping del sistema di compressione (CO1A/B) del gas di recupero,revamping del sistema di compressione del gas di boil-off etilene (P501 A/B)e incremento dell'affidabilità di marcia del compressore K7001 di invio del fuel gas export |
Procedure starting date : |
21/03/2013 |
Decision Number: |
DVA-2013-0017334 |
Decision Date: |
24/07/2013 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/512 |
18/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/512 |
Application submission date: |
26/02/2013 |
Ministry Protocol Application submission: |
DVA - 2013 - 0005677 |
Ministry Protocol date of application submission: |
06/03/2013 |
Subject: |
Modifica alla prescrizione n.20 riportata al paragrafo 9.5 del PIC allegato al decreto AIA |
Procedure starting date : |
18/03/2013 |
Decision Number: |
DVA-2013-0017334 |
Decision Date: |
24/07/2013 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
133/431 |
15/11/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133/431 |
Application submission date: |
03/10/2012 |
Ministry Protocol Application submission: |
DVA-2012-0023970 |
Ministry Protocol date of application submission: |
05/10/2012 |
Subject: |
Valutazione ottemperanza prescrizioni art.1, commi 3 -4 e 7 del decreto AIA |
Procedure starting date : |
15/11/2012 |
Decision Number: |
DVA-2013-0017331 |
Decision Date: |
24/07/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
First IPPC permit for existing installation |
133 |
16/04/2007 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
133 |
Application submission date: |
28/03/2007 |
Ministry Protocol Application submission: |
DSA-2007-0011034 |
Ministry Protocol date of application submission: |
16/04/2007 |
Date of request for integrations: |
28/08/2009 |
IPPC Committee's opinion date: |
30/06/2011 |
Services Conference call date: |
08/07/2011 |
Decision Number: |
DVA - DEC - 2011 - 0000514 |
Decision Date: |
16/09/2011 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |