IPPC permit for non substantial changes |
87/15673 |
23/01/2024 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/15673 |
Reference of previous authorization's Act: |
D.M. 95 del 22/02/2022 |
Application submission date: |
23/01/2024 |
Ministry Protocol Application submission: |
prot. MASE/12086 |
Ministry Protocol date of application submission: |
23/01/2024 |
Subject: |
installazione di impianto fotovoltaico a terra da 9,4 MWp |
Procedure starting date : |
26/01/2024 |
Launch of public consultation: |
26/01/2024 |
Deadline of submission of Public Comments on IPPC permit: |
25/02/2024 |
Stage of the Procedure: |
on-going procedure |
IPPC permit for non substantial changes |
87/15475 |
27/12/2023 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/15475 |
Reference of previous authorization's Act: |
D.M. 95 del 22/02/2022 |
Application submission date: |
27/12/2023 |
Ministry Protocol Application submission: |
prot. MASE/212950 |
Ministry Protocol date of application submission: |
27/12/2023 |
Subject: |
realizzazione di una nuova vasca di equalizzazione acque reflue |
Procedure starting date : |
02/01/2024 |
Launch of public consultation: |
02/01/2024 |
Deadline of submission of Public Comments on IPPC permit: |
01/02/2024 |
Stage of the Procedure: |
on-going procedure |
Reconsideration of compliance to permit conditions |
87/14343 |
07/04/2023 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/14343 |
Reference of previous authorization's Act: |
D.M. 95 DEL 22/02/2022 |
Ministry Protocol Application submission: |
prot. MASE-2023-56194 |
Ministry Protocol date of application submission: |
07/04/2023 |
Subject: |
adempimento della prescrizione al punto C capitolo 10 di cui al DM 95/2022 |
Procedure starting date : |
12/04/2023 |
Launch of public consultation: |
12/04/2023 |
Deadline of submission of Public Comments on IPPC permit: |
12/05/2023 |
Stage of the Procedure: |
on-going procedure |
IPPC permit for non substantial changes |
87/11578 |
26/05/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/11578 |
Ministry Protocol date of application submission: |
26/05/2021 |
Procedure starting date : |
09/06/2021 |
Decision Number: |
DM 95 |
Decision Date: |
22/02/2022 |
Date of notification to the developer of the procedure outcomes: |
04/03/2022 |
Notification Reference number: |
MITE-2022-27864 |
Outcome: |
POSITIVO |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/11551 |
09/04/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/11551 |
Reference of previous authorization's Act: |
D.M. 263 |
Ministry Protocol Application submission: |
richiesta di proroga dei tempi di attuazione delle prescrizioni di cui al PIC ID 87/1056 punti 12.3.6, 12.3.8 a) b) d), 12.4.28 i) |
Ministry Protocol date of application submission: |
09/04/2021 |
Procedure starting date : |
21/05/2021 |
Decision Number: |
DM 105 |
Decision Date: |
09/03/2022 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
15/03/2022 |
Notification Reference number: |
MITE-2022-32705 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/11305 |
18/02/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/11305 |
Reference of previous authorization's Act: |
D.M. 263 del 2017 |
Ministry Protocol date of application submission: |
18/02/2021 |
Subject: |
Riesame AIA per gestione del sistema di blowdown,gestione acque meteoriche e deposito del rifiuto filter cake |
Procedure starting date : |
14/05/2021 |
Launch of public consultation: |
01/03/2021 |
Deadline of submission of Public Comments on IPPC permit: |
31/03/2021 |
Decision Number: |
DM 159 |
Decision Date: |
14/04/2022 |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/11355 |
11/02/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/11355 |
Reference of previous authorization's Act: |
D.M. 263 del 2017 |
Ministry Protocol Application submission: |
MATTM-2021-14373 |
Ministry Protocol date of application submission: |
11/02/2021 |
Procedure starting date : |
16/03/2021 |
Decision Number: |
DM 93 |
Decision Date: |
22/02/2022 |
Date of notification to the developer of the procedure outcomes: |
02/03/2022 |
Notification Reference number: |
MITE-2022-26398 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
87/9927 |
17/01/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/9927 |
Reference of previous authorization's Act: |
DEC-MIN-0000263 del 11/10/2017 |
Application submission date: |
16/01/2019 |
Ministry Protocol Application submission: |
DVA/2019/1045 |
Ministry Protocol date of application submission: |
17/01/2019 |
Subject: |
Richiesta di proroga di 12 mesi per il completamento della barriera verde tra il perimetro della stabilimento e l'abitato di cui alla prescrizione n. 52 del PIC. |
Procedure starting date : |
01/02/2019 |
Launch of public consultation: |
11/03/2019 |
Deadline of submission of Public Comments on IPPC permit: |
10/04/2019 |
Decision Number: |
DVA/2019/7173 |
Decision Date: |
21/03/2019 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/9719 |
12/11/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/9719 |
Reference of previous authorization's Act: |
DM 263 del 11/10/2017 |
Application submission date: |
12/11/2018 |
Ministry Protocol Application submission: |
DVA/2018/25486 |
Ministry Protocol date of application submission: |
12/11/2018 |
Subject: |
Modifica serbatoio S102 |
Procedure starting date : |
20/11/2018 |
Decision Number: |
DVA/2019/1247 |
Decision Date: |
08/02/2019 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
08/02/2019 |
Notification Reference number: |
DVA/2019/1247 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
87/9718 |
12/11/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/9718 |
Reference of previous authorization's Act: |
DM 263 del 11/10/2017 |
Application submission date: |
12/11/2018 |
Ministry Protocol Application submission: |
DVA/2018/25485 |
Ministry Protocol date of application submission: |
12/11/2018 |
Subject: |
proroga di 12 mesi della data di installazione sistema recupero vapori |
Procedure starting date : |
20/11/2018 |
Decision Number: |
DVA/2019/4453 |
Decision Date: |
21/02/2019 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
21/02/2019 |
Notification Reference number: |
DVA/2019/4453 |
Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/1056 |
15/04/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/1056 |
Reference of previous authorization's Act: |
DSA-DEC-2009-230 |
Application submission date: |
08/04/2016 |
Ministry Protocol Application submission: |
Decreto 128/DVA |
Ministry Protocol date of application submission: |
08/04/2016 |
Subject: |
Riesame complessivo |
Procedure starting date : |
15/04/2016 |
Decision Number: |
D.M. 263 |
Decision Date: |
11/10/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/987 |
08/03/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/987 |
Application submission date: |
05/01/2016 |
Ministry Protocol Application submission: |
585 |
Ministry Protocol date of application submission: |
13/01/2016 |
Subject: |
Relazione di Riferimento |
Procedure starting date : |
08/03/2016 |
Decision Number: |
30820/DVA |
Decision Date: |
21/12/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
87/848 |
13/04/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/848 |
Application submission date: |
30/12/2014 |
Ministry Protocol Application submission: |
DVA-2015-0000516 |
Ministry Protocol date of application submission: |
09/01/2015 |
Subject: |
Deroga rispetto dei limiti per utilizzo residui di distillazione di cui all'art 28 c 4 punti 3.3 e 3.4 |
Procedure starting date : |
13/04/2015 |
Decision Number: |
D.M. 286 |
Decision Date: |
21/12/2015 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
118/882 |
08/04/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/882 |
Application submission date: |
18/03/2015 |
Ministry Protocol Application submission: |
DVA-2015-0008794 |
Ministry Protocol date of application submission: |
31/03/2015 |
Subject: |
Adeguamento CTE impianti NORD - EX VERSALIS |
Procedure starting date : |
08/04/2015 |
Decision Number: |
D.M. 55 |
Decision Date: |
04/03/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/870 |
05/03/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/870 |
Application submission date: |
10/02/2015 |
Ministry Protocol Application submission: |
DVA-2015-0003815 |
Ministry Protocol date of application submission: |
12/02/2015 |
Subject: |
Esclusione serbatoi (S400, S401, S405, S406 ed S411) e convogliamento vapori da sfiato serbatoio S203 |
Procedure starting date : |
05/03/2015 |
Decision Number: |
5764/DVA |
Decision Date: |
02/03/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/829 |
03/12/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/829 |
Application submission date: |
17/11/2014 |
Ministry Protocol Application submission: |
DVA-2014-0038482 |
Ministry Protocol date of application submission: |
21/11/2014 |
Subject: |
Riesame per aggiornamento AIA a seguito della rimodulazione degli investimenti |
Procedure starting date : |
03/12/2014 |
Decision Number: |
D.M. 263 |
Decision Date: |
11/10/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
118/795 |
03/09/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/795 |
Application submission date: |
24/07/2014 |
Ministry Protocol Application submission: |
DVA-23014-0024840 |
Ministry Protocol date of application submission: |
25/07/2014 |
Subject: |
Modifica non sostanziale per l'installazione di 2 nuovi compresori di recupero gas torcia, il ricolocamento dell'attuale compressore di recupero gas di torcia K601, il collettamento al sistema di recupero gas di torcia dello sfiato del serbatoio closed drain denominato V09 e un sistema di bonifica dei bracci di carico del GPL presenti nella piattaforma A2 del pontile. |
Procedure starting date : |
03/09/2014 |
Decision Number: |
D.M. 247 |
Decision Date: |
22/09/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
118/784 |
04/08/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/784 |
Application submission date: |
24/06/2014 |
Ministry Protocol Application submission: |
DVA-2014-0020922 |
Ministry Protocol date of application submission: |
26/06/2014 |
Subject: |
Modifica non sostanziale per gli interventi presso l'impianto Reforming, di realizzazione di una nuova unità di lavaggio del gas ricco di idrogeno con ammina. |
Procedure starting date : |
04/08/2014 |
Decision Number: |
9895/DVA |
Decision Date: |
13/04/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/789 |
29/07/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/789 |
Application submission date: |
10/06/2014 |
Ministry Protocol Application submission: |
DVA-2014-0018585 |
Ministry Protocol date of application submission: |
12/06/2014 |
Subject: |
Modifica prescrizione installazione del sistema recupero vapori. |
Procedure starting date : |
29/07/2014 |
Decision Number: |
DM 263 |
Decision Date: |
11/10/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/782 |
25/07/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/782 |
Application submission date: |
23/06/2014 |
Ministry Protocol Application submission: |
DVA-2014-0021420 |
Ministry Protocol date of application submission: |
30/06/2014 |
Subject: |
Modifica non sostanziale lavaggio fuel gas DEA1-DEA2-DEA3 realizzazione circuito di interscambio amminatra Sarlux e Versalis |
Procedure starting date : |
25/07/2014 |
Decision Number: |
DVA-2014-0041722 |
Decision Date: |
18/12/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
118/711 |
22/04/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/711 |
Application submission date: |
20/01/2014 |
Ministry Protocol Application submission: |
DVA-2014-0002219 |
Ministry Protocol date of application submission: |
29/01/2014 |
Subject: |
Modifica sostanziale relativamente ai limiti di emissione della torcia di stabilimento |
Procedure starting date : |
22/04/2014 |
Date of request for integrations: |
28/04/2014 |
Decision Number: |
D.M. 247 |
Decision Date: |
22/09/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/742 |
16/04/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/742 |
Application submission date: |
24/03/2014 |
Ministry Protocol Application submission: |
DVA-2014-0009402 |
Ministry Protocol date of application submission: |
02/04/2014 |
Subject: |
Modifica non sostanziale installazione nuovo l'impianto di trattamento e recupero acqua da sour water stripper |
Procedure starting date : |
16/04/2014 |
Decision Number: |
DVA-2014-0041716 |
Decision Date: |
18/12/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/712 |
12/02/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/712 |
Application submission date: |
16/01/2014 |
Ministry Protocol Application submission: |
DVA-2014-0002204 |
Ministry Protocol date of application submission: |
29/01/2014 |
Subject: |
Modifia non sostanziale per sostituzione blowers K1- C1 A/B Impianto FCC. |
Procedure starting date : |
12/02/2014 |
Decision Number: |
DVA-2014-0041721 |
Decision Date: |
18/12/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/705 |
31/01/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/705 |
Application submission date: |
17/12/2013 |
Ministry Protocol Application submission: |
DVA-2013-0030327 |
Ministry Protocol date of application submission: |
30/12/2013 |
Subject: |
Modifica non sostanziale all'impianto Topping 1 - recupero termico dei fumi del formo T1-F101 |
Procedure starting date : |
31/01/2014 |
Decision Number: |
DVA-2014-0041719 |
Decision Date: |
18/12/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
118/680 |
13/01/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/680 |
Application submission date: |
30/12/2013 |
Ministry Protocol Application submission: |
DVA-2013-0000057 |
Ministry Protocol date of application submission: |
03/01/2014 |
Subject: |
Modifica non sostanziale per la realizzazione di interventi mirati alla riduzione del fabbisogno di vapore |
Procedure starting date : |
13/01/2014 |
Decision Number: |
D.M. 263 |
Decision Date: |
11/10/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
118/576 |
11/07/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
118/576 |
Application submission date: |
28/06/2013 |
Ministry Protocol Application submission: |
DVA-2013-0015468 |
Ministry Protocol date of application submission: |
02/07/2013 |
Subject: |
Modifica non sostanziale alla frequenza dei campionamenti manuali e analisi di laboratorio da settimanale a mensile per istallazione del nuovo SME |
Procedure starting date : |
11/07/2013 |
Decision Number: |
5746/DVA |
Decision Date: |
02/03/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
87/543 |
14/06/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/543 |
Application submission date: |
30/04/2013 |
Ministry Protocol Application submission: |
DVA-2013-0010833 |
Ministry Protocol date of application submission: |
10/05/2013 |
Procedure starting date : |
14/06/2013 |
Decision Number: |
DM 215 |
Decision Date: |
26/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/553 |
03/06/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/553 |
Application submission date: |
16/05/2013 |
Ministry Protocol Application submission: |
DVA-2013-0011903 |
Ministry Protocol date of application submission: |
22/05/2013 |
Subject: |
Modifica non sostanziale invio eluati salini a impianto trattamento acque di zavorra TAZ |
Procedure starting date : |
03/06/2013 |
Decision Number: |
DVA-2014-41720 |
Decision Date: |
18/12/2014 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/486 |
17/01/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/486 |
Application submission date: |
18/12/2012 |
Ministry Protocol Application submission: |
DVA - 2013 - 0000101 |
Ministry Protocol date of application submission: |
03/01/2013 |
Subject: |
Modifica non sostanziale:Sistema di monitoraggio in continuo delle polveri sul punto di emissione FCC CO boiler (camino 15). |
Procedure starting date : |
17/01/2013 |
Decision Number: |
DVA-2013-0010610 |
Decision Date: |
08/05/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/479 |
20/12/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/479 |
Application submission date: |
05/12/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0030690 |
Ministry Protocol date of application submission: |
17/12/2012 |
Subject: |
Modifica non sostanziale per rimodulazione degli investimenti riferiti al nuovo assetto produttivo rispetto a pag.24 del Parere Istruttorio |
Procedure starting date : |
20/12/2012 |
Decision Number: |
DVA-2013-0008608 |
Decision Date: |
11/04/2013 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/415 |
19/09/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/415 |
Application submission date: |
10/08/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0020037 |
Ministry Protocol date of application submission: |
21/08/2012 |
Subject: |
Modifica non sostanziale al monitoraggio in continuo dei parametri H2S e COV |
Procedure starting date : |
19/09/2012 |
IPPC Committee's opinion date: |
19/12/2012 |
Decision Number: |
DVA-2012-0031507 |
Decision Date: |
27/12/2012 |
Decisions' Outcome: |
Negativo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/405 |
04/07/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/405 |
Application submission date: |
21/06/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 16141 |
Ministry Protocol date of application submission: |
04/07/2012 |
Subject: |
Modifica non sostanziale al sistema recupero vapori presso il terminale marittimo |
Decision Number: |
DVA-2013-0013636 |
Decision Date: |
12/06/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/306 |
01/02/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/306 |
Application submission date: |
03/01/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0000267 |
Ministry Protocol date of application submission: |
09/01/2012 |
Subject: |
Modifiche non sostanziali installazione sistema di monitoraggio in continuo delle polveri sul punto di emissione FCC CO Boiler |
Procedure starting date : |
01/02/2012 |
IPPC Committee's opinion date: |
24/10/2012 |
Decision Number: |
DVA - 2012 - 0026104 |
Decision Date: |
29/10/2012 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/279 |
30/08/2011 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/279 |
Application submission date: |
16/07/2011 |
Ministry Protocol Application submission: |
DVA - 2011 - 0018400 |
Ministry Protocol date of application submission: |
26/07/2011 |
Subject: |
Modifiche non sostanziali - Prescritti sulle aree di Stoccaggio provvisorio materiali e macchinari. |
Procedure starting date : |
30/08/2011 |
Decision Number: |
DVA - 2012 - 0018583 |
Decision Date: |
01/08/2012 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/280 |
30/08/2011 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/280 |
Application submission date: |
16/07/2011 |
Ministry Protocol Application submission: |
DVA - 2011 - 0018398 |
Ministry Protocol date of application submission: |
26/07/2011 |
Subject: |
Modifiche non sostanziali:Programma LDAR |
Procedure starting date : |
30/08/2011 |
Decision Number: |
DVA - 2012 - 0018584 |
Decision Date: |
01/08/2012 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/208 |
13/04/2010 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/208 |
Application submission date: |
04/12/2009 |
Ministry Protocol Application submission: |
DSA - 2009 - 0033650 |
Ministry Protocol date of application submission: |
11/12/2009 |
Subject: |
rimodulazione degli investimenti riferiti al nuovo assetto produttivo come indicato a pag.24 del PI |
Procedure starting date : |
13/04/2010 |
Date of request for integrations: |
01/04/2010 |
Decision Number: |
DVA - 2010 - 0014752 |
Decision Date: |
09/06/2010 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/209 |
10/02/2010 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/209 |
Application submission date: |
23/12/2009 |
Ministry Protocol Application submission: |
DVA - 2010 - 0000250 |
Ministry Protocol date of application submission: |
15/01/2010 |
Subject: |
emissioni convogliate in aria pag.31 del PI, relative all'impianto IGCC |
Procedure starting date : |
10/02/2010 |
Decision Number: |
DVA - 2010 - 0014752 |
Decision Date: |
09/06/2010 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
87/210 |
21/10/2009 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87/210 |
Application submission date: |
08/10/2009 |
Ministry Protocol Application submission: |
DSA-2009-0027880 |
Ministry Protocol date of application submission: |
19/10/2009 |
Subject: |
Modifiche Unità FCC-COBoiler |
Procedure starting date : |
21/10/2009 |
Decision Number: |
DVA - 2010 - 0014752 |
Decision Date: |
09/06/2010 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
First IPPC permit for existing installation |
87 |
07/02/2007 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
87 |
Application submission date: |
29/01/2007 |
Ministry Protocol Application submission: |
DSA-2007-0003822 |
Ministry Protocol date of application submission: |
07/02/2007 |
Date of request for integrations: |
11/02/2008 |
IPPC Committee's opinion date: |
13/11/2008 |
Services Conference call date: |
27/11/2008 |
Decision Number: |
DSA-DEC-2009-0000230 |
Decision Date: |
24/03/2009 |
Decisions' Outcome: |
Positivo |
Expiration Date of the Authorization: |
24/03/2017 |
Stage of the Procedure: |
Concluded |