Completamento infrastruttura al Porto di Vasto interventi di potenziamento ed ampliamento - fase 1. banchina levante/molo martello/molo sopraflutto. CUP E37H21010820006 - CIG 9365148C9A | 17/11/2023 | 17/12/2023 | Info and procedures | documents | Download |
Svincolo di Scandicci: allacciamento A1 - S.G.C. Firenze-Pisa-Livorno - Viabilità urbana. | 22/03/2022 | 21/04/2022 | Info and procedures | documents | Download |
Rifacimento dorsale acquedottistica della Val Nure: Fasi 1-2-3. Tracciato in sponda Nure | 28/01/2022 | 27/02/2022 | Info and procedures | documents | Download |
A4 motorway - Plan for Road Safety - Construction of 2 parking areas for heavy vehicles - Fratta nord and Fratta sud parking areas | 23/04/2018 | 07/06/2018 | Info and procedures | documents | Download |
Rationalization of the 220 kV electricity grid in the municipality of Terni - Air shifting of the Pietrafitta-Villavalle power line (Borgo Rivo, Campitello and Fontana di Polo) along the line of the closed Villavalle-San Dalmazio power line | 25/01/2018 | 11/03/2018 | Info and procedures | documents | Download |
Trans Adriatic Pipeline - Albania-Italy pipeline | 09/08/2017 | 23/09/2017 | Info and procedures | documents | Download |
850 MWe combined cycle thermal power plant in Presenzano and related works | 01/08/2017 | 15/09/2017 | Info and procedures | documents | Download |
150 kV single circuit overhead power line "S. Procopio - Palmi Sud" and demolition of the existing power line (Rationalization of the high voltage electricity grid in Reggio Calabria) | 21/07/2017 | 09/09/2017 | Info and procedures | documents | Download |
Port of Livorno - Restoration of the basin around the Marzocco tower | 28/06/2017 | 12/08/2017 | Info and procedures | documents | Download |
Refinery of Sannazzaro de' Burgondi (PV) - Restoration of the Slurry section of the EST plant | 28/06/2017 | 12/08/2017 | Info and procedures | documents | Download |