Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Rationalization and development of the National Transmission Grid in the Media valle del Piave


General information

Work: Rationalization and development of the National Transmission Grid in the Media valle del Piave

Project: Rationalization and development of the National Transmission Grid in the Media valle del Piave

Description: The rationalization and development of the National Transmission Grid in the Media valle del Piave involves several interventions within the Development Plan for the National Transmission Grid, such as the Polpet 220 kV electrical substation, the 132 kV power line connecting Desedan to Forno di Zoldo, the rearrangement of the network in the northern area of the Province of Belluno.

Developer: Terna Rete Elettrica Nazionale S.p.A.

Project type: Electrical power lines

Deadline for submission of comments: 26/03/2022 mail

Other projects related to the same work: Show / Hide

Territories and marine areas

Map

Regions: Veneto

Provinces: Belluno

Municipalities: Ponte nelle Alpi, Belluno, Longarone, Soverzene, Castellavazzo, Perarolo di Cadore, Ospitale di Cadore, Limana

Marine areas: None

Select procedure

Procedure Procedure Code Starting date Stage of the procedure
EIA Screening 7526 18/10/2021 Concluded Procedure details Documents
EIA Compliance 5858 22/02/2021 Concluded Procedure details Documents
EIA Compliance 5861 22/02/2021 Concluded Procedure details Documents
Environmental Impact Assessment 1673 23/11/2011 Concluded Procedure details Documents