Work: Gas pipeline "Natural gas transport system in the center and south of the Sardinia"
Project: Gas pipeline "Natural gas transport system in the center and south of the Sardinia"
Description: The project involves the construction of a pipeline of 195 km long in the center and south of Sardinia. The gas pipeline route includes the laying of the DN 400 DP 75 gas pipeline from Sarroch to Villaspeciosa 28,6 km long, the DN 400 DP 75 pipeline from Villaspeciosa to Palmas Arborea 71,8 km long, the Cagliari and Oristano connection gas pipeline and the gas pipeline of Oristano, Sulcis and Cagliari.
Developer: Società Gasdotti Italia S.p.A
Project type: Natural gas pipelines
Regions: Sardegna
Provinces: Ogliastra, Cagliari, Oristano, Carbonia-Iglesias, Medio Campidano
Municipalities: Marrubiu, Santa Giusta, Siliqua, Sarroch, Assemini, Decimoputzu, San Gavino Monreale, Domusnovas, Oristano, Serramanna, Iglesias, Capoterra, Pabillonis, Villamassargia, Selargius, Musei, Sardara, Villacidro, Palmas Arborea, Uras, Villaspeciosa, Decimomannu, Monserrato, Mogoro, Sestu, Uta, Vallermosa, Carbonia, Villasor
Marine areas: None
Procedure | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|
Environmental Impact Assessment | 3696 | 15/09/2017 | Concluded | Procedure details | Documents |