Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Co-generation plant in Ravenna - Installation of the B 600 boiler in place of the existing B 400


General information

Work: Co-generation plant in Ravenna

Project: Co-generation plant in Ravenna - Installation of the B 600 boiler in place of the existing B 400

Description: The project involves the replacement of the boiler B400 with 323 MWt c with the new boiler B600 of lower thermal power (170 MWt), to increase the reliability of steam supply to the Ravenna plant and improve the emissions levels.

Developer: Enipower S.p.A.

Project type: Thermal power plant

Other projects related to the same work: Show / Hide

Territories and marine areas

Map

Regions: Emilia Romagna

Provinces: Ravenna

Municipalities: Ravenna

Marine areas: None

Select procedure

Procedure Procedure Code Starting date Stage of the procedure
EIA Compliance 11084 09/02/2024 Decision being prepared Procedure details Documents
EIA Compliance 9770 09/11/2022 Decision being prepared Procedure details Documents
EIA Screening 2544 01/10/2013 Concluded Procedure details Documents